{"id":809,"date":"2023-11-01T02:05:28","date_gmt":"2023-11-01T02:05:28","guid":{"rendered":"https:\/\/economicherald.net\/?p=809"},"modified":"2023-11-01T02:05:28","modified_gmt":"2023-11-01T02:05:28","slug":"blast-off-accelerate-starts-fieldwork-at-new-karratha-lithium-projects","status":"publish","type":"post","link":"https:\/\/economicherald.net\/?p=809","title":{"rendered":"Blast Off: Accelerate starts fieldwork at new Karratha lithium projects"},"content":{"rendered":"<p>Accelerate has started mapping and sampling at its Prinsep lithium project in WA<br \/>\nPrinsep is one of four recently acquired projects that make up the company\u2019s Karratha lithium tenements<br \/>\nAccelerate is doubling down on drill targets at Prinsep ahead of maiden drilling<br \/>\nMapping and sampling to follow at Mt Sholl, Mt Sholl East and Roebourne South<\/p>\n<p>\u00a0<\/p>\n<p><strong>Accelerate Resources has commenced detailed mapping and sampling at its Karratha lithium projects to double down on future drill targets.<\/strong><strong>\u00a0<\/strong><\/p>\n<p>The company recently added four \u2018transformational\u2019 Karratha tenements to its <a href=\"https:\/\/stockhead.com.au\/resources\/walk-up-drill-targets-accelerate-acquires-kathleen-valley-like-azure-adjacent-outcropping-spod-rich-pegmatite-systems\/\"><strong>growing battery metals portfolio<\/strong><\/a> \u2013 the Prinsep, Mt Sholl, Mt Sholl East and Roebourne South projects.<\/p>\n<p>Notably, Karratha is right in the heart of the Pilbara\u2019s 40km-long Karratha-Roebourne lithium belt, where recent discoveries include<strong>\u00a0<\/strong><a href=\"https:\/\/stockhead.com.au\/company\/azure-minerals-azs\/\"><strong>Azure Minerals\u2019 (ASX:AZS)<\/strong><\/a><strong>\u00a0<\/strong>monstrous Andover project (exploration target 100-240Mt at 1-1.5% Li2O).<\/p>\n<p>A high-resolution aerial imagery and digital elevation survey has been completed at Prinsep to assist with identifying new lithium-bearing pegmatites and detailed mapping and follow-up sampling has commenced with a view to planning a series of drill targets.<\/p>\n<p>The wider Mt Sholl, Mt Sholl East and Roebourne South projects will also be mapped for prospective geology and sampled where pegmatites are identified.<\/p>\n<p>These projects have never been systematically explored or drilled for lithium.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p>Karratha lithium projects location map. Pic via Accelerate Resources<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<h2><strong>Doubling down on drill targets at Prinsep<\/strong><\/h2>\n<p>Prinsep is particularly exciting, boasting two large, completely undrilled outcropping spodumene-rich pegmatite systems spanning across the entire 2km width of the tenement area and beyond, <a href=\"https:\/\/stockhead.com.au\/company\/accelerate-resources-ax8\/\"><strong>Accelerate Resources (ASX:AX8)<\/strong><\/a> says.<\/p>\n<p>\u00a0<\/p>\n<p>Project manager Kevin Joyce on site mapping the Prinsep South pegmatite. Pic via Accelerate Resources<\/p>\n<p>\u00a0<\/p>\n<p>Here, recent rock chip sampling has returned grades up to 1.87% Li2O from the Southern Pegmatite system and 1.29% Li2O from the Northern Pegmatite system.<\/p>\n<p>The aerial imagery and digital elevation survey is expected to assist with geological mapping, target generation, reporting, and general visualisation of the area.<\/p>\n<p>Integration of the enhanced imagery and digital terrain model (DTM) will be used to construct a 3D map view to assist with lithological and structural mapping, delineation of pegmatite outcrops and optimisation of drill targeting.<strong>\u00a0<\/strong><\/p>\n<p>A shallow maiden drilling program will be conducted as soon as possible following DMIRS Program of Works approval and any heritage clearance approvals.<\/p>\n<p>\u00a0<\/p>\n<p>Outcropping pegmatites and initial rock chip sample results from the Prinsep lithium project north and south trends. Pic via Accelerate Resources<\/p>\n<p>\u00a0<\/p>\n<h2><strong>New project manager to accelerate lithium search<\/strong><\/h2>\n<p>AX8 has also appointed a new project manager in experienced geologist Kevin Joyce to accelerate the lithium search at the Karratha projects.<\/p>\n<p>Joyce has over 25 years\u2019 experience in the resources sector with an impressive resume which includes the discovery of <a href=\"https:\/\/stockhead.com.au\/company\/leo-lithium-lll\/\"><strong>Leo Lithium\u2019s (ASX:LLL)<\/strong><\/a> world-class Goulamina lithium deposit in Mali which has a resource of 211Mt at 1.37% Li2O2.<\/p>\n<p>This is expected to preserve up to $600,000 cash to boost the exploration budget.<\/p>\n<p>\u00a0<\/p>\n\n<p><span class=\"mce_SELRES_start\">\ufeff<\/span>\u00a0<\/p>\n<p><em>This article was developed in collaboration with Accelerate Resources, a Stockhead advertiser at the time of publishing. <\/em><\/p>\n<p><em>\u00a0<\/em><\/p>\n<p><em>This article does not constitute financial product advice. You should consider obtaining independent advice before making any financial decisions.<\/em><\/p>\n<p><span class=\"et_bloom_bottom_trigger\"><\/span><\/p>\n<p>The post <a href=\"https:\/\/stockhead.com.au\/resources\/blast-off-accelerate-starts-fieldwork-at-new-karratha-lithium-projects\/\">Blast Off: Accelerate starts fieldwork at new Karratha lithium projects<\/a> appeared first on <a href=\"https:\/\/stockhead.com.au\/\">Stockhead<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>Accelerate has started mapping and sampling at its Prinsep lithium project in WA Prinsep is one of four recently acquired projects that make up the <a href=\"https:\/\/economicherald.net\/?p=809\" class=\"read-more-link\">[more&#8230;]<\/a><\/p>\n","protected":false},"author":0,"featured_media":810,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-809","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-finance"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Blast Off: Accelerate starts fieldwork at new Karratha lithium projects - Economic Herald<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/economicherald.net\/?p=809\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Blast Off: Accelerate starts fieldwork at new Karratha lithium projects - Economic Herald\" \/>\n<meta property=\"og:description\" content=\"Accelerate has started mapping and sampling at its Prinsep lithium project in WA Prinsep is one of four recently acquired projects that make up the [more...]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/economicherald.net\/?p=809\" \/>\n<meta property=\"og:site_name\" content=\"Economic Herald\" \/>\n<meta property=\"article:published_time\" content=\"2023-11-01T02:05:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/economicherald.net\/wp-content\/uploads\/2023\/11\/AX8-Hero-Pic-23LRO0.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"2142\" \/>\n\t<meta property=\"og:image:height\" content=\"1205\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=809#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=809\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"Blast Off: Accelerate starts fieldwork at new Karratha lithium projects\",\"datePublished\":\"2023-11-01T02:05:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=809\"},\"wordCount\":539,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=809#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/economicherald.net\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/AX8-Hero-Pic-23LRO0.jpeg\",\"articleSection\":[\"Finance\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/economicherald.net\\\/?p=809#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=809\",\"url\":\"https:\\\/\\\/economicherald.net\\\/?p=809\",\"name\":\"Blast Off: Accelerate starts fieldwork at new Karratha lithium projects - Economic Herald\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=809#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=809#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/economicherald.net\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/AX8-Hero-Pic-23LRO0.jpeg\",\"datePublished\":\"2023-11-01T02:05:28+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=809#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/economicherald.net\\\/?p=809\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=809#primaryimage\",\"url\":\"https:\\\/\\\/economicherald.net\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/AX8-Hero-Pic-23LRO0.jpeg\",\"contentUrl\":\"https:\\\/\\\/economicherald.net\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/AX8-Hero-Pic-23LRO0.jpeg\",\"width\":2142,\"height\":1205},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=809#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/economicherald.net\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Blast Off: Accelerate starts fieldwork at new Karratha lithium projects\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/economicherald.net\\\/#website\",\"url\":\"https:\\\/\\\/economicherald.net\\\/\",\"name\":\"Economic Herald\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/economicherald.net\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/economicherald.net\\\/#organization\",\"name\":\"Economic Herald\",\"url\":\"https:\\\/\\\/economicherald.net\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/economicherald.net\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/economicherald.net\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/cropped-cropped-economicheraldlogo-1.png\",\"contentUrl\":\"https:\\\/\\\/economicherald.net\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/cropped-cropped-economicheraldlogo-1.png\",\"width\":850,\"height\":760,\"caption\":\"Economic Herald\"},\"image\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Blast Off: Accelerate starts fieldwork at new Karratha lithium projects - Economic Herald","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/economicherald.net\/?p=809","og_locale":"en_US","og_type":"article","og_title":"Blast Off: Accelerate starts fieldwork at new Karratha lithium projects - Economic Herald","og_description":"Accelerate has started mapping and sampling at its Prinsep lithium project in WA Prinsep is one of four recently acquired projects that make up the [more...]","og_url":"https:\/\/economicherald.net\/?p=809","og_site_name":"Economic Herald","article_published_time":"2023-11-01T02:05:28+00:00","og_image":[{"width":2142,"height":1205,"url":"https:\/\/economicherald.net\/wp-content\/uploads\/2023\/11\/AX8-Hero-Pic-23LRO0.jpeg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/economicherald.net\/?p=809#article","isPartOf":{"@id":"https:\/\/economicherald.net\/?p=809"},"author":{"name":"","@id":""},"headline":"Blast Off: Accelerate starts fieldwork at new Karratha lithium projects","datePublished":"2023-11-01T02:05:28+00:00","mainEntityOfPage":{"@id":"https:\/\/economicherald.net\/?p=809"},"wordCount":539,"commentCount":0,"publisher":{"@id":"https:\/\/economicherald.net\/#organization"},"image":{"@id":"https:\/\/economicherald.net\/?p=809#primaryimage"},"thumbnailUrl":"https:\/\/economicherald.net\/wp-content\/uploads\/2023\/11\/AX8-Hero-Pic-23LRO0.jpeg","articleSection":["Finance"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/economicherald.net\/?p=809#respond"]}]},{"@type":"WebPage","@id":"https:\/\/economicherald.net\/?p=809","url":"https:\/\/economicherald.net\/?p=809","name":"Blast Off: Accelerate starts fieldwork at new Karratha lithium projects - Economic Herald","isPartOf":{"@id":"https:\/\/economicherald.net\/#website"},"primaryImageOfPage":{"@id":"https:\/\/economicherald.net\/?p=809#primaryimage"},"image":{"@id":"https:\/\/economicherald.net\/?p=809#primaryimage"},"thumbnailUrl":"https:\/\/economicherald.net\/wp-content\/uploads\/2023\/11\/AX8-Hero-Pic-23LRO0.jpeg","datePublished":"2023-11-01T02:05:28+00:00","breadcrumb":{"@id":"https:\/\/economicherald.net\/?p=809#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/economicherald.net\/?p=809"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/economicherald.net\/?p=809#primaryimage","url":"https:\/\/economicherald.net\/wp-content\/uploads\/2023\/11\/AX8-Hero-Pic-23LRO0.jpeg","contentUrl":"https:\/\/economicherald.net\/wp-content\/uploads\/2023\/11\/AX8-Hero-Pic-23LRO0.jpeg","width":2142,"height":1205},{"@type":"BreadcrumbList","@id":"https:\/\/economicherald.net\/?p=809#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/economicherald.net\/"},{"@type":"ListItem","position":2,"name":"Blast Off: Accelerate starts fieldwork at new Karratha lithium projects"}]},{"@type":"WebSite","@id":"https:\/\/economicherald.net\/#website","url":"https:\/\/economicherald.net\/","name":"Economic Herald","description":"","publisher":{"@id":"https:\/\/economicherald.net\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/economicherald.net\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/economicherald.net\/#organization","name":"Economic Herald","url":"https:\/\/economicherald.net\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/economicherald.net\/#\/schema\/logo\/image\/","url":"https:\/\/economicherald.net\/wp-content\/uploads\/2023\/10\/cropped-cropped-economicheraldlogo-1.png","contentUrl":"https:\/\/economicherald.net\/wp-content\/uploads\/2023\/10\/cropped-cropped-economicheraldlogo-1.png","width":850,"height":760,"caption":"Economic Herald"},"image":{"@id":"https:\/\/economicherald.net\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/economicherald.net\/index.php?rest_route=\/wp\/v2\/posts\/809","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/economicherald.net\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/economicherald.net\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/economicherald.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=809"}],"version-history":[{"count":0,"href":"https:\/\/economicherald.net\/index.php?rest_route=\/wp\/v2\/posts\/809\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/economicherald.net\/index.php?rest_route=\/wp\/v2\/media\/810"}],"wp:attachment":[{"href":"https:\/\/economicherald.net\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=809"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/economicherald.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=809"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/economicherald.net\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=809"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}