{"id":1937,"date":"2023-11-21T02:19:40","date_gmt":"2023-11-21T02:19:40","guid":{"rendered":"https:\/\/economicherald.net\/?p=1937"},"modified":"2023-11-21T02:19:40","modified_gmt":"2023-11-21T02:19:40","slug":"drilling-costs-reduced-by-whopping-40pc-at-botala-energys-five-well-serowe-gas-play-in-botswana","status":"publish","type":"post","link":"https:\/\/economicherald.net\/?p=1937","title":{"rendered":"Drilling costs reduced by whopping 40pc at Botala Energy\u2019s five-well Serowe gas play in Botswana"},"content":{"rendered":"<p>Cost of drilling Serowe\u2019s wells reduced by ~40% via simplified vertical well extraction techniques<br \/>\nSerowe-3.5 is the central production well for Project Pitse<br \/>\nPitse\u2019s resource can feed Botswana\u2019s Orapa gas plant for the next 20-years<\/p>\n<p>\u00a0<\/p>\n<p><strong><em>Special Report: <\/em><\/strong><strong>Results from Botala Energy\u2019s Project Pitse\u2019s Serowe-3.5 well in Botswana have intercepted 25m of highly prospective coal in the two upper coal seams. <\/strong><\/p>\n<p>Serowe-3.5 is the central well of the five-well system at Project Pitse and is pegged to be its first well into production.<\/p>\n<p>Pitse itself is <a href=\"https:\/\/stockhead.com.au\/company\/botala-energy-bte\/\"><strong>Botala Energy\u2019s (ASX:BTE)<\/strong><\/a> first commercial pilot project within the Serowe coal bed methane gas project.<\/p>\n<p>It contains an independently certified 2C resource of 317 billion cubic feet (Bcf) based off five historical exploration wells that all intersected 24-40m of net coal, including the prospecting Serowe and Upper Morupule formations at a relatively low $220,000 average cost per well.<\/p>\n<p>BTE says this is enough to fuel Botswana\u2019s nearby Orapa gas power station for the next 20 years.<\/p>\n<p>Serowe 3.1 was spudded back in July 2021 and <a href=\"https:\/\/stockhead.com.au\/energy\/major-milestone-botala-energys-serowe-3-1-well-flares-gas\/\"><strong>already has flowed gas to surface<\/strong><\/a><strong>, <\/strong>proving that target coals have opened up and are now degassing \u2013 data vital for the continuing development of Project Pitse\u2019s other four wells.<\/p>\n<p>Flaring produced a peak flowrate of 42,000 standard cubic feet per day (scfd) and is still increasing in pressure, providing confidence that Pitse should \u201creadily achieve the target mid-case commercial flowrate\u201d for the five-well system of 70scfd \u2013 based on BTE\u2019s economic analysis.<\/p>\n<p>\u00a0<\/p>\n<p>Well sites at Botala\u2019s Project Pitse in Botswana. Pic supplied: (BTE).<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<h2><strong>Serowe\u2019s latest<\/strong><\/h2>\n<p>Coals at Serowe-3.5 were drilled down to 476m and intersected 25m of net coal in the two upper coal seams. They were first encountered at 344m \u2013 17m higher than in Serowe-3.1, which is 350m to the north.<\/p>\n<p>Importantly, the cost to drill the wells has been reduced by a gigantic ~40% as BTE has confirmed that gas can be extracted from low-capex vertical wells.<\/p>\n<p>BTE CEO Kris Martinick says the most encouraging thing is not just consistent results but also the vast improvement in operational efficiencies.<\/p>\n<p>\u201cWe have reduced our drilling time from 42 days on the Serowe-2 well to now consistently completing drilling in 10 days and significantly reduced our drilling costs by around 40%,\u201d Martinick says.<\/p>\n<p>\u00a0<\/p>\n<h2><strong>What\u2019s next?<\/strong><\/h2>\n<p>Drilling and core collection through the Serowe-3.4 coal seams is set to commence prior to further production test drilling. BTE has subsequently mobilised a field lab to site for gas desorption and testing of the cores.<\/p>\n<p>The concept for Project Pitse is progressing to revenue-generating gas production and establishing a 20MW hybrid gas\/solar plant, designed to generate electricity for the Botswana power grid if gas flows confirm economic viability.<\/p>\n<p>\u00a0<\/p>\n\n<p><span class=\"mce_SELRES_start\">\ufeff<\/span><em>This article was developed in collaboration with Botala Energy, a Stockhead advertiser at the time of publishing.<\/em><em>This article does not constitute financial product advice. You should consider obtaining independent advice before making any financial decisions.<\/em><\/p>\n<p>\u00a0<\/p>\n\n<p><em>This article was developed in collaboration with Botala Energy, a Stockhead advertiser at the time of publishing.<\/em><\/p>\n<p>\u00a0<\/p>\n<p><em>This article does not constitute financial product advice. You should consider obtaining independent advice before making any financial decisions.<\/em><\/p>\n<p>\u00a0<\/p>\n<p><span class=\"et_bloom_bottom_trigger\"><\/span><\/p>\n<p>The post <a href=\"https:\/\/stockhead.com.au\/energy\/drilling-costs-reduced-by-whopping-40pc-at-botala-energys-five-well-serowe-gas-play-in-botswana\/\">Drilling costs reduced by whopping 40pc at Botala Energy\u2019s five-well Serowe gas play in Botswana<\/a> appeared first on <a href=\"https:\/\/stockhead.com.au\/\">Stockhead<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>Cost of drilling Serowe\u2019s wells reduced by ~40% via simplified vertical well extraction techniques Serowe-3.5 is the central production well for Project Pitse Pitse\u2019s resource <a href=\"https:\/\/economicherald.net\/?p=1937\" class=\"read-more-link\">[more&#8230;]<\/a><\/p>\n","protected":false},"author":0,"featured_media":1938,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-1937","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-finance"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Drilling costs reduced by whopping 40pc at Botala Energy\u2019s five-well Serowe gas play in Botswana - Economic Herald<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/economicherald.net\/?p=1937\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Drilling costs reduced by whopping 40pc at Botala Energy\u2019s five-well Serowe gas play in Botswana - Economic Herald\" \/>\n<meta property=\"og:description\" content=\"Cost of drilling Serowe\u2019s wells reduced by ~40% via simplified vertical well extraction techniques Serowe-3.5 is the central production well for Project Pitse Pitse\u2019s resource [more...]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/economicherald.net\/?p=1937\" \/>\n<meta property=\"og:site_name\" content=\"Economic Herald\" \/>\n<meta property=\"article:published_time\" content=\"2023-11-21T02:19:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/economicherald.net\/wp-content\/uploads\/2023\/11\/BTE-sDkKhA.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"468\" \/>\n\t<meta property=\"og:image:height\" content=\"263\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=1937#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=1937\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"Drilling costs reduced by whopping 40pc at Botala Energy\u2019s five-well Serowe gas play in Botswana\",\"datePublished\":\"2023-11-21T02:19:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=1937\"},\"wordCount\":557,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=1937#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/economicherald.net\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/BTE-sDkKhA.jpeg\",\"articleSection\":[\"Finance\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/economicherald.net\\\/?p=1937#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=1937\",\"url\":\"https:\\\/\\\/economicherald.net\\\/?p=1937\",\"name\":\"Drilling costs reduced by whopping 40pc at Botala Energy\u2019s five-well Serowe gas play in Botswana - Economic Herald\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=1937#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=1937#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/economicherald.net\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/BTE-sDkKhA.jpeg\",\"datePublished\":\"2023-11-21T02:19:40+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=1937#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/economicherald.net\\\/?p=1937\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=1937#primaryimage\",\"url\":\"https:\\\/\\\/economicherald.net\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/BTE-sDkKhA.jpeg\",\"contentUrl\":\"https:\\\/\\\/economicherald.net\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/BTE-sDkKhA.jpeg\",\"width\":468,\"height\":263},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=1937#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/economicherald.net\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Drilling costs reduced by whopping 40pc at Botala Energy\u2019s five-well Serowe gas play in Botswana\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/economicherald.net\\\/#website\",\"url\":\"https:\\\/\\\/economicherald.net\\\/\",\"name\":\"Economic Herald\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/economicherald.net\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/economicherald.net\\\/#organization\",\"name\":\"Economic Herald\",\"url\":\"https:\\\/\\\/economicherald.net\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/economicherald.net\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/economicherald.net\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/cropped-cropped-economicheraldlogo-1.png\",\"contentUrl\":\"https:\\\/\\\/economicherald.net\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/cropped-cropped-economicheraldlogo-1.png\",\"width\":850,\"height\":760,\"caption\":\"Economic Herald\"},\"image\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Drilling costs reduced by whopping 40pc at Botala Energy\u2019s five-well Serowe gas play in Botswana - Economic Herald","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/economicherald.net\/?p=1937","og_locale":"en_US","og_type":"article","og_title":"Drilling costs reduced by whopping 40pc at Botala Energy\u2019s five-well Serowe gas play in Botswana - Economic Herald","og_description":"Cost of drilling Serowe\u2019s wells reduced by ~40% via simplified vertical well extraction techniques Serowe-3.5 is the central production well for Project Pitse Pitse\u2019s resource [more...]","og_url":"https:\/\/economicherald.net\/?p=1937","og_site_name":"Economic Herald","article_published_time":"2023-11-21T02:19:40+00:00","og_image":[{"width":468,"height":263,"url":"https:\/\/economicherald.net\/wp-content\/uploads\/2023\/11\/BTE-sDkKhA.jpeg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/economicherald.net\/?p=1937#article","isPartOf":{"@id":"https:\/\/economicherald.net\/?p=1937"},"author":{"name":"","@id":""},"headline":"Drilling costs reduced by whopping 40pc at Botala Energy\u2019s five-well Serowe gas play in Botswana","datePublished":"2023-11-21T02:19:40+00:00","mainEntityOfPage":{"@id":"https:\/\/economicherald.net\/?p=1937"},"wordCount":557,"commentCount":0,"publisher":{"@id":"https:\/\/economicherald.net\/#organization"},"image":{"@id":"https:\/\/economicherald.net\/?p=1937#primaryimage"},"thumbnailUrl":"https:\/\/economicherald.net\/wp-content\/uploads\/2023\/11\/BTE-sDkKhA.jpeg","articleSection":["Finance"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/economicherald.net\/?p=1937#respond"]}]},{"@type":"WebPage","@id":"https:\/\/economicherald.net\/?p=1937","url":"https:\/\/economicherald.net\/?p=1937","name":"Drilling costs reduced by whopping 40pc at Botala Energy\u2019s five-well Serowe gas play in Botswana - Economic Herald","isPartOf":{"@id":"https:\/\/economicherald.net\/#website"},"primaryImageOfPage":{"@id":"https:\/\/economicherald.net\/?p=1937#primaryimage"},"image":{"@id":"https:\/\/economicherald.net\/?p=1937#primaryimage"},"thumbnailUrl":"https:\/\/economicherald.net\/wp-content\/uploads\/2023\/11\/BTE-sDkKhA.jpeg","datePublished":"2023-11-21T02:19:40+00:00","breadcrumb":{"@id":"https:\/\/economicherald.net\/?p=1937#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/economicherald.net\/?p=1937"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/economicherald.net\/?p=1937#primaryimage","url":"https:\/\/economicherald.net\/wp-content\/uploads\/2023\/11\/BTE-sDkKhA.jpeg","contentUrl":"https:\/\/economicherald.net\/wp-content\/uploads\/2023\/11\/BTE-sDkKhA.jpeg","width":468,"height":263},{"@type":"BreadcrumbList","@id":"https:\/\/economicherald.net\/?p=1937#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/economicherald.net\/"},{"@type":"ListItem","position":2,"name":"Drilling costs reduced by whopping 40pc at Botala Energy\u2019s five-well Serowe gas play in Botswana"}]},{"@type":"WebSite","@id":"https:\/\/economicherald.net\/#website","url":"https:\/\/economicherald.net\/","name":"Economic Herald","description":"","publisher":{"@id":"https:\/\/economicherald.net\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/economicherald.net\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/economicherald.net\/#organization","name":"Economic Herald","url":"https:\/\/economicherald.net\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/economicherald.net\/#\/schema\/logo\/image\/","url":"https:\/\/economicherald.net\/wp-content\/uploads\/2023\/10\/cropped-cropped-economicheraldlogo-1.png","contentUrl":"https:\/\/economicherald.net\/wp-content\/uploads\/2023\/10\/cropped-cropped-economicheraldlogo-1.png","width":850,"height":760,"caption":"Economic Herald"},"image":{"@id":"https:\/\/economicherald.net\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/economicherald.net\/index.php?rest_route=\/wp\/v2\/posts\/1937","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/economicherald.net\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/economicherald.net\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/economicherald.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1937"}],"version-history":[{"count":0,"href":"https:\/\/economicherald.net\/index.php?rest_route=\/wp\/v2\/posts\/1937\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/economicherald.net\/index.php?rest_route=\/wp\/v2\/media\/1938"}],"wp:attachment":[{"href":"https:\/\/economicherald.net\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1937"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/economicherald.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1937"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/economicherald.net\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1937"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}