{"id":11838,"date":"2024-07-04T02:09:06","date_gmt":"2024-07-04T02:09:06","guid":{"rendered":"https:\/\/economicherald.net\/?p=11838"},"modified":"2024-07-04T02:09:06","modified_gmt":"2024-07-04T02:09:06","slug":"equinox-has-three-new-blocks-to-drill-at-campo-grande-ree-project-in-brazil","status":"publish","type":"post","link":"https:\/\/economicherald.net\/?p=11838","title":{"rendered":"Equinox has three new blocks to drill at Campo Grande REE project in Brazil"},"content":{"rendered":"<p>Three new target areas defined from geological analysis work at Equinox Resources\u2019 Campo Grande<br \/>\nDrilling to kick off at the Jaguaquara and Jitauna prospects<br \/>\nEQN is well funded for drilling with a $5.3m cash position<\/p>\n<p>\u00a0<\/p>\n<p><strong><em>Special Report<\/em><\/strong><strong>: New geological data has identified additional drill targets ahead of another exploration campaign at Equinox Resources\u2019 Campo Grande REE project in Brazil.<\/strong><\/p>\n<p><a href=\"https:\/\/stockhead.com.au\/company\/equinox-resources-eqn\/\"><strong>Equinox Resources\u2019 (ASX:EQN)<\/strong><\/a> new Amargosa, Jita\u00fana and Jaguaquara target areas are geologically inserted in the Jequi\u00e9 Complex and Volta do Rio Plutonic Suite areas of Campo Grande, known for hosting high-grade hard rock REE mineralisation.<\/p>\n<p>The project is essentially adjacent to, and has the largest land position around ASX market darling <a href=\"https:\/\/stockhead.com.au\/company\/brazilian-rare-earths-bre\/\"><strong>Brazilian Rare Earths\u2019 (ASX:BRE)<\/strong><\/a> growing world-class 510Mt REE and critical minerals portfolio in the Rocha da Rocha REE district.<\/p>\n<p>Interestingly, EQN\u2019s new Jaguaquara block testing targets are just ~3km from BRE\u2019s Sulista discovery, which returned assays showing 22.4% total rare earth oxide recently.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<h2><strong>New suite of targets<\/strong><\/h2>\n<p>Results from a continuing regional surface sampling campaign across Campo Grande showed mineralisation can occur from surface outcrops at the Amargosa, Jita\u00fana and Jaguaquara blocks and extend up to 75m deep, hosting REE, niobium, scandium and uranium cumulate.<\/p>\n<p>Along with nearology to Sulista, the high priority targets are also located ~2km away from BRE\u2019s Pele project that has returned high grade assays of up to 10.4% TREO.<\/p>\n<p>Surface samples from the Jaguaquara target region is interpreted to be linked to a regional-scale linear structure extending over 15 km NW-SE, indicating high REE prospectivity.<\/p>\n<p>This linear structure starts from the Rio Negro drill target and continues into the Jaguaquara block. Assays from recent drilling at Rio Negro are still pending.<\/p>\n<p>EQN\u2019s new target blocks at Campo Grande. Pic: EQN<\/p>\n<p>\u201cWe\u2019re in the very early stages of exploring our REE ground at the Campo Grande prospects, with only ~1% of our prospects currently drilled,\u201d EQN MD Zac Komur says.<\/p>\n<p>\u201cBy working through geochemical and geophysical data to pinpoint new additional drill targets, we have identified some high-priority areas for a drilling campaign aimed at delineating hard rock REE deposits.<\/p>\n<p>\u201cThis process has focused our efforts on areas within the Amargosa, Jita\u00fana, and Jaguaquara blocks.<\/p>\n<p>\u201cWe plan to deploy in depth drilling programs on these new drilling targets proximal to Brazilian Rare Earths\u2019 discovery imminently.\u201d<\/p>\n<p>EQN is in the final stages of awarding drilling contracts for a larger scale drilling program targeting REE in hard rock across Campo Grande.<\/p>\n<p>It recently completed a $4m capital raise and has a strong cash position of $5.3m, allowing for uninterrupted drilling campaigns across identified REE prospects.<\/p>\n<p>\u00a0<\/p>\n\n<p><span class=\"mce_SELRES_start\">\ufeff<\/span>\u00a0<\/p>\n<p><em>This article was developed in collaboration with Equinox Resources, a Stockhead advertiser at the time of publishing.<\/em><\/p>\n<p>\u00a0<\/p>\n<p><em>This article does not constitute financial product advice. You should consider obtaining independent advice before making any financial decisions.<\/em><\/p>\n<p>The post <a href=\"https:\/\/stockhead.com.au\/resources\/equinox-has-three-new-blocks-to-drill-at-campo-grande-ree-project-in-brazil\/\">Equinox has three new blocks to drill at Campo Grande REE project in Brazil<\/a> appeared first on <a href=\"https:\/\/stockhead.com.au\/\">Stockhead<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>Three new target areas defined from geological analysis work at Equinox Resources\u2019 Campo Grande Drilling to kick off at the Jaguaquara and Jitauna prospects EQN <a href=\"https:\/\/economicherald.net\/?p=11838\" class=\"read-more-link\">[more&#8230;]<\/a><\/p>\n","protected":false},"author":0,"featured_media":11839,"comment_status":"","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-11838","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-finance"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Equinox has three new blocks to drill at Campo Grande REE project in Brazil - Economic Herald<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/economicherald.net\/?p=11838\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Equinox has three new blocks to drill at Campo Grande REE project in Brazil - Economic Herald\" \/>\n<meta property=\"og:description\" content=\"Three new target areas defined from geological analysis work at Equinox Resources\u2019 Campo Grande Drilling to kick off at the Jaguaquara and Jitauna prospects EQN [more...]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/economicherald.net\/?p=11838\" \/>\n<meta property=\"og:site_name\" content=\"Economic Herald\" \/>\n<meta property=\"article:published_time\" content=\"2024-07-04T02:09:06+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=11838#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=11838\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"Equinox has three new blocks to drill at Campo Grande REE project in Brazil\",\"datePublished\":\"2024-07-04T02:09:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=11838\"},\"wordCount\":503,\"publisher\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=11838#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/economicherald.net\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/GettyImages-829781188-1200_x_675-J1v2a9.jpeg\",\"articleSection\":[\"Finance\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=11838\",\"url\":\"https:\\\/\\\/economicherald.net\\\/?p=11838\",\"name\":\"Equinox has three new blocks to drill at Campo Grande REE project in Brazil - Economic Herald\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=11838#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=11838#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/economicherald.net\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/GettyImages-829781188-1200_x_675-J1v2a9.jpeg\",\"datePublished\":\"2024-07-04T02:09:06+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=11838#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/economicherald.net\\\/?p=11838\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=11838#primaryimage\",\"url\":\"https:\\\/\\\/economicherald.net\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/GettyImages-829781188-1200_x_675-J1v2a9.jpeg\",\"contentUrl\":\"https:\\\/\\\/economicherald.net\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/GettyImages-829781188-1200_x_675-J1v2a9.jpeg\",\"width\":1200,\"height\":675},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/economicherald.net\\\/?p=11838#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/economicherald.net\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Equinox has three new blocks to drill at Campo Grande REE project in Brazil\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/economicherald.net\\\/#website\",\"url\":\"https:\\\/\\\/economicherald.net\\\/\",\"name\":\"Economic Herald\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/economicherald.net\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/economicherald.net\\\/#organization\",\"name\":\"Economic Herald\",\"url\":\"https:\\\/\\\/economicherald.net\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/economicherald.net\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/economicherald.net\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/cropped-cropped-economicheraldlogo-1.png\",\"contentUrl\":\"https:\\\/\\\/economicherald.net\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/cropped-cropped-economicheraldlogo-1.png\",\"width\":850,\"height\":760,\"caption\":\"Economic Herald\"},\"image\":{\"@id\":\"https:\\\/\\\/economicherald.net\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Equinox has three new blocks to drill at Campo Grande REE project in Brazil - Economic Herald","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/economicherald.net\/?p=11838","og_locale":"en_US","og_type":"article","og_title":"Equinox has three new blocks to drill at Campo Grande REE project in Brazil - Economic Herald","og_description":"Three new target areas defined from geological analysis work at Equinox Resources\u2019 Campo Grande Drilling to kick off at the Jaguaquara and Jitauna prospects EQN [more...]","og_url":"https:\/\/economicherald.net\/?p=11838","og_site_name":"Economic Herald","article_published_time":"2024-07-04T02:09:06+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/economicherald.net\/?p=11838#article","isPartOf":{"@id":"https:\/\/economicherald.net\/?p=11838"},"author":{"name":"","@id":""},"headline":"Equinox has three new blocks to drill at Campo Grande REE project in Brazil","datePublished":"2024-07-04T02:09:06+00:00","mainEntityOfPage":{"@id":"https:\/\/economicherald.net\/?p=11838"},"wordCount":503,"publisher":{"@id":"https:\/\/economicherald.net\/#organization"},"image":{"@id":"https:\/\/economicherald.net\/?p=11838#primaryimage"},"thumbnailUrl":"https:\/\/economicherald.net\/wp-content\/uploads\/2024\/07\/GettyImages-829781188-1200_x_675-J1v2a9.jpeg","articleSection":["Finance"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/economicherald.net\/?p=11838","url":"https:\/\/economicherald.net\/?p=11838","name":"Equinox has three new blocks to drill at Campo Grande REE project in Brazil - Economic Herald","isPartOf":{"@id":"https:\/\/economicherald.net\/#website"},"primaryImageOfPage":{"@id":"https:\/\/economicherald.net\/?p=11838#primaryimage"},"image":{"@id":"https:\/\/economicherald.net\/?p=11838#primaryimage"},"thumbnailUrl":"https:\/\/economicherald.net\/wp-content\/uploads\/2024\/07\/GettyImages-829781188-1200_x_675-J1v2a9.jpeg","datePublished":"2024-07-04T02:09:06+00:00","breadcrumb":{"@id":"https:\/\/economicherald.net\/?p=11838#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/economicherald.net\/?p=11838"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/economicherald.net\/?p=11838#primaryimage","url":"https:\/\/economicherald.net\/wp-content\/uploads\/2024\/07\/GettyImages-829781188-1200_x_675-J1v2a9.jpeg","contentUrl":"https:\/\/economicherald.net\/wp-content\/uploads\/2024\/07\/GettyImages-829781188-1200_x_675-J1v2a9.jpeg","width":1200,"height":675},{"@type":"BreadcrumbList","@id":"https:\/\/economicherald.net\/?p=11838#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/economicherald.net\/"},{"@type":"ListItem","position":2,"name":"Equinox has three new blocks to drill at Campo Grande REE project in Brazil"}]},{"@type":"WebSite","@id":"https:\/\/economicherald.net\/#website","url":"https:\/\/economicherald.net\/","name":"Economic Herald","description":"","publisher":{"@id":"https:\/\/economicherald.net\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/economicherald.net\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/economicherald.net\/#organization","name":"Economic Herald","url":"https:\/\/economicherald.net\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/economicherald.net\/#\/schema\/logo\/image\/","url":"https:\/\/economicherald.net\/wp-content\/uploads\/2023\/10\/cropped-cropped-economicheraldlogo-1.png","contentUrl":"https:\/\/economicherald.net\/wp-content\/uploads\/2023\/10\/cropped-cropped-economicheraldlogo-1.png","width":850,"height":760,"caption":"Economic Herald"},"image":{"@id":"https:\/\/economicherald.net\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/economicherald.net\/index.php?rest_route=\/wp\/v2\/posts\/11838","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/economicherald.net\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/economicherald.net\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/economicherald.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11838"}],"version-history":[{"count":0,"href":"https:\/\/economicherald.net\/index.php?rest_route=\/wp\/v2\/posts\/11838\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/economicherald.net\/index.php?rest_route=\/wp\/v2\/media\/11839"}],"wp:attachment":[{"href":"https:\/\/economicherald.net\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11838"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/economicherald.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11838"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/economicherald.net\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11838"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}